Honoured to be selected as the HVAC service provider of choice for this prestigious downtown brewery loft, a historic building once home to CBC News. Our team successfully retrofitted the space with a new, high-performance make-up air unit, enhancing comfort and efficiency while preserving the building’s heritage character. The project supports our ongoing mission to improve indoor air quality, energy performance, and environmental sustainability.

🔧 Project Highlights:

  • Replacement of the aging Make-Up Air Unit with a new high efficiency, engineered air system
  • Upgraded ductwork, improved insulation, and advanced system integration
  • Enhanced chilled water piping infrastructure
  • Smart control systems for better building management
  • Projected reduction in HVAC-related energy consumption
  • Another GHG emissions reduction project of over 5 metric tons of CO₂e annually
  • Supports Toronto’s climate action plan by increasing building energy resilience and efficiency

⚠️ Key Challenges:

  • Limited access and staging space in a dense urban environment
  • Maintaining minimal disruption for residents during active construction
  • Integration with existing building systems and controls

This project is a key part of our commitment to creating safer, greener, and more comfortable living spaces for all residents.

©2026 Complete Energy Solutions. All rights reserved. Powered by 84m

CONTACT US

Our customer service team is standing by to serve you.

Sending

Log in with your credentials

Forgot your details?